Moorfields Private Eye Hospital – Phase 3
Healthcare Moorfields Private Eye Hospital – Phase 3 Budget: £700,000
Client: Moorfields Private Eye Hospital

Phase 3 of 3 of this prestigious project was completed with the refurbishment of an additional ten overnight suites within the Cumberlege Wing, refurbishment to the main corridor, creation of new Patient Waiting Area and Offices for staff. Through all three phases we have successfully completed the creation of a new bespoke accommodation for Moorfield’s Private Eye Hospital including providing a substantial strip-out though-out the entire level; forming new stud partitions and wall linings; new walnut timber doors; new suspended & plasterboard ceilings, complete redecorations works of a high standard including new vinyl flat lay and sheet flooring; new clinical handwash basins and new fitted office furniture, storage units; the supply of new soft seating and general repairs and improvements of the space. The ability to deliver a complete package included for the complete new installation of electrical installations; new LED lighting installations; Newly designed Mechanical Comfort Cooling & Heating, Heat recovery (VAM) ventilation installations not excluding alterations to the Fire Safety System, Panic alarms, CCTV, Access Control System, Structured cabling installations and the installation of a new Platform Bed lift.

MORE PROJECTS